MTD 27-Ton Servisní příručka Strana 63

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 72
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 62
Tank and Tires
59
Vertical locking rod
To remove the vertical locking rod:
1. Pry the push cap off of the vertical locking rod.
See Figure 7.17.
2. Remove the spring.
3. Slide the locking rod out of the uprights on the tank.
To install the vertical locking rod:
4. Slide the locking rod through the uprights on the tank
from the engine side.
5. Slide the spring over the straight end of the locking
rod.
6. Compress the spring and hold it in that position with a
pair of locking pliers.
See Figure 7.18.
7. Install the push cap onto the end of the locking rod.
8. Release the locking pliers.
9. Test the locking rod by moving the beam from vertical
to horizontal and back a few time.
10. Test run the splitter before returning it to service.
Figure 7.17
Push cap
Spring
Figure 7.18
Locking pliers
For Parts Call 606-678-9623 or 606-561-4983
www.mymowerparts.com
Zobrazit stránku 62
1 2 ... 58 59 60 61 62 63 64 65 66 67 68 ... 71 72

Komentáře k této Příručce

Žádné komentáře